100 1195 |
Gallery |
Published |
|
|
10 19 05 view of siphon installed piping network before placement of concrete chamber |
Gallery |
Published |
|
|
Aerial photograph of audenreid treatment system before construction |
Gallery |
Published |
|
|
Site of audenreid mine tunnel opening pre construction conditions 2 |
Gallery |
Published |
|
|
Site of audenreid mine tunnel opening pre construction conditions. |
Gallery |
Published |
|
|
Site preparation for limestone tanks |
Gallery |
Published |
|
|
View looking downstream of audenreid mine tunnel opening showing proper es controls. |
Gallery |
Published |
|
|
11 09 05 view of 2nd settling pond with berms that will be below water level when full |
Gallery |
Published |
|
|
View of audenreid treatment system showing the three limestone tanks and two settling ponds. |
Gallery |
Published |
|
|
11 14 05 view of first pond below limestone tanks with berms that will be below water level when full |
Gallery |
Published |
|
|
9 6 05 limestone addition to tanks |
Gallery |
Published |
|
|
07 21 05 view of intake system site preparation from above mine opening |
Gallery |
Published |
|
|
7 18 05 rebar placement for concrete limestone tank base |
Gallery |
Published |
|
|
7 18 2005 clearing of mine tunnel opening |
Gallery |
Published |
|
|
7 18 2005 site excavation of treatment system intake location |
Gallery |
Published |
|
|
7 19 05 pouring concrete for base of limestone tanks2 |
Gallery |
Published |
|
|
7 19 05 preparing site for intake system construction |
Gallery |
Published |
|
|
7 22 05 preparing to pour side walls of concrete limestone tanks |
Gallery |
Published |
|
|
08 10 2 2 |
Gallery |
Published |
|
|
5 1 2005 clearing and grubbing at location of limestone tanks and settling ponds |
Gallery |
Published |
|
|
08 10 05 view of intake system showing rock filter and rip rap lined overflow channel |
Gallery |
Published |
|
|
5 8 2005 clearing grubbing and es control placement at mine opening and intake location |
Gallery |
Published |
|
|
8 10 05 pouring concrete for limestone tank side wall |
Gallery |
Published |
|
|
5 9 2005 cleared area for limestone tanks and settling ponds |
Gallery |
Published |
|
|
8 16 05 installation of distribution chamber |
Gallery |
Published |
|
|
5 12 2005 clearing and grubbing at limestone tanks and settling ponds location |
Gallery |
Published |
|
|
8 24 05 installation of piping system from intake to limestone tanks |
Gallery |
Published |
|
|
06 17 06 audenreid site dedication |
Gallery |
Published |
|
|
8 24 05 preparing to pour side walls of concrete limestone tanks |
Gallery |
Published |
|
|
07 05 06 clearing debris from distribution box after flood damage. |
Gallery |
Published |
|
|
8 24 05 view of treatment system intake with rock filter and rock lined channel |
Gallery |
Published |
|
|
07 05 06 view of collapsed mine opening and damaged intake system after the june 27 29 2006 flooding |
Gallery |
Published |
|
|
Audenreid Tunnel Cross Section |
Gallery |
Published |
|
|
audenried_treatment_tanks |
Gallery |
Published |
|
|
100_0314 |
Gallery |
Published |
|
|
Audenreid Flood Repair Design 2007 |
Downloads |
Published |
|
|
Audenreid Design 2005 |
Downloads |
Published |
|
|
O&M Plan-Final |
Downloads |
Published |
|
|
Audenreid Tunnel / Analysis Report, Import 8 |
Analysis Report |
Published |
|
|
Water Quality Report |
Downloads |
Published |
|
|
Audenreid Financial Report |
Downloads |
Published |
|
|
Audenreid Final Report 12-07 |
Downloads |
Published |
|
|
Audenreid Tunnel Schematic |
Downloads |
Published |
|
|
Audenreid Mine Tunnel Summary |
Downloads |
Published |
|
|
Final Catawissa Creek Restoration Plan |
Downloads |
Published |
|
|
Catawissa Creek |
Watershed |
Published |
|
|
Catawissa Creek |
Watershed |
Published |
|
|
Catawissa Creek |
Watershed |
Published |
|
|
Catawissa Creek |
Watershed |
Published |
|
|
Catawissa Creek |
Watershed |
Published |
|
|